x Need help? We're here for you.

Call +1 408 419 0462
Email Us

REDUCE POST PRODUCTION RISK – GE, INDIA

GE Logo

 

The Project:

Size: 800-node, mixed cluster
Primary SI: HP

The Challenges:

  • 10 different fabrics needed to become one
  • Mix fabric speeds, DDR/QDR/FDR
  • Fabric’s health is known to be unstable
  • Firmware/ software compatibility at such size

The Solution:

  • PS worked closely with R&D to mimic such a cluster
  • PS conductedpre project health check for all fabrics and identified
    the weak spots
  • PS created a simulation of the future “OneIB” fabric and created a
    unique, specifically tailoredsolution

The Benefit:

While on site, Mellanox PS fixed all issues found in the individual clusters, and united all clusters into a single fabric across the building fiber layout. All done within 5 on-site days

NVIDIA Mellanox Cookie Policy

This website uses cookies which may help to deliver content tailored to your preferences and interests, provide you with a better browsing experience, and to analyze our traffic. You may delete and/or block out cookies from this site, but it may affect how the site operates. Further information can be found in our Privacy Policy.